Phasing a whole property without paying twice

Almost nobody does it all at once. Doing it in the right order is what makes that cheap instead of expensive.

Talk about your property (805) 208-3739

Most properties are built in phases, and phasing well is a decision made at the beginning rather than a decision to stop halfway. A phased plan and an abandoned plan look identical after phase one; they diverge sharply at phase two, and the thing that separates them is what went into the ground while it was open.

Design the whole property, build a piece of it

The design costs a fraction of the construction and it is what makes every later phase straightforward. Knowing where the pool will eventually go changes where a wall is built today, and knowing where the kitchen goes changes which trench gets a gas sleeve.

Designing only the piece you can afford is how phase two starts by demolishing phase one.

Which phase to do first, and why it is rarely the pretty one

The first phase should be the work that everything else depends on and that is most expensive to retrofit: grading, drainage, the services, and the structural walls that set the levels. That is a phase with very little to show for it, which is why it is unpopular and why it is right.

The exception is a small, self-contained area that can be finished properly and used while the rest waits. Having one part of the property genuinely done is worth a great deal to the people living there.

What phasing actually costs

More than doing it in one go, and less than doing it twice. Every mobilization has a cost, and each phase pays it again. Against that, phasing spreads the spend and lets decisions about later phases be made by people who have now lived with the earlier ones, which routinely improves them.

Questions people actually ask

How long can we leave between phases?

Years, if the services and levels were built for the whole plan. What ages badly is not the pause, it is an unfinished slope or an open drainage run left through a winter.

Will the materials still match later?

Not exactly, and anybody promising otherwise is guessing. Stone and concrete weather, and production runs change. It is a reason to complete a continuous surface in one phase rather than to avoid phasing.

Do we have to use the same company for every phase?

No, and the plan and the as-built service locations are yours, which is what makes changing company possible without starting again.